UNS S32750

Super Duplex 2507 Stud & Nut Sets

ASME B18.31.2 · ASME B18.2.2ASTM A276 / A479 — bar

Super Duplex 2507 stud and nut sets for desalination pressure flanges, combining chloride-resistant studs with explicitly matched nuts and traceable component lots.

MOQ
100PCS
Samples · typical
~20 days
Production · typical
25–35 days
Heat treatment
Solution annealed and quenched

EN 10204 3.1 MTC + heat-number traceability

Upload drawing

Super Duplex 2507 in this connection

High chromium, molybdenum and nitrogen support resistance to chloride pitting, alongside high duplex-stainless strength.

Connection
High-pressure seawater & concentrate flanges
Critical dimensions
Stud length · nut pattern · external / internal thread fit

Which standard is on your order?

Raw Material Specifications

Finished-Component Specifications

Threads · Metric

Threads · Inch

Dimension Reference

Heat Treatment

Solution annealed and rapidly cooled

Solution annealing followed by rapid cooling controls harmful precipitates and preserves the ferrite–austenite structure.

What we can make in Super Duplex 2507

Forms & dimension guide
Fully threaded stud between two nuts

Stud

Finished stud length covers the flange stack, gasket and both nut engagements. Full-length thread permits nut positioning from either end for cover removal and flange assembly.

Pair of nuts on the threaded stud

Nuts

Match nut thread class and proof-load requirements to the stud. Regular and heavy-hex patterns need different socket clearances and bearing footprints around the flange holes.

Product forms
Full-thread stud + 2 nuts · Stud + 2 nuts + washers
Dimensional control
Stud length · nut pattern · external / internal thread fit
Manufacturing
Machine and thread the stud; manufacture mating nuts to their own pattern and thread class. Inspect each component before packing by set.
Final condition
Solution annealing and rapid cooling control phase balance and limit harmful intermetallic phases.
Inspection
Heat traceability · mechanical properties · specified phase-balance and corrosion tests

Where Super Duplex 2507 fits — and what matters

Water-treatment machinery with parallel green pipes, gray pumps and yellow access platforms

Water Treatment & Desalination

Filter housings and treatment-pump covers

Super Duplex 2507 fully threaded stud & nut sets supply the stud and two mating nuts for filter housings and treatment-pump covers as one assembly line item. Thread fit, nut pattern and stud length are coordinated before packing. The water stream, cleaning cycle and retained liquid define exposure at the installed part.

Stud length · two nuts · component heat identity
Water Treatment & Desalination fasteners
Ship machinery compartment with green pumps, insulated pipes and pressure gauges

Offshore & Marine

Seawater pump and cooling-system covers

Super Duplex 2507 fully threaded stud & nut sets supply the stud and two mating nuts for seawater pump and cooling-system covers as one assembly line item. Thread fit, nut pattern and stud length are coordinated before packing. The assembled contact is exposed to saltwater, deposits and neighbouring metals.

Stud length · two nuts · component heat identity
Offshore & Marine fasteners
Gas-processing plant with a process tower and twin stacks beyond a cultivated field

Oil & Gas

Process valves and equipment closures

Super Duplex 2507 fully threaded stud & nut sets supply the stud and two mating nuts for process valves and equipment closures as one assembly line item. Thread fit, nut pattern and stud length are coordinated before packing. Utility connections and pressure-boundary parts have separate acceptance requirements on the equipment drawing.

Stud length · two nuts · component heat identity
Oil & Gas fasteners

Same stud & nut set. Different material priorities.

Super Duplex 2507 material data
Solution annealed and quenched

Duplex 2205

Duplex stainless combines higher yield strength than conventional austenitic grades with improved resistance to chloride stress-corrosion cracking.

Duplex 2205 Stud & Nut Sets
Grade 1 — Annealed / Grade 2 — Solution annealed

Inconel 625

Molybdenum and niobium provide solid-solution strength, combined with resistance to chloride pitting and crevice corrosion.

Inconel 625 Stud & Nut Sets
Solution annealed

Hastelloy C-276

A nickel-chromium-molybdenum-tungsten alloy for severe process corrosion, including reducing acids and wet-chlorine environments.

Hastelloy C-276 Stud & Nut Sets
Solution annealed

316L

Molybdenum-bearing, low-carbon austenitic stainless steel for wet equipment and routine washdown.

316L Stud & Nut Sets

From drawing to documented delivery

Heat treatment
Heat treatment
CNC machining
CNC machining
Rockwell hardness testing
Rockwell hardness testing
Wooden-crate packing
Wooden-crate packing
  1. 01Drawing & BOMGrade, condition and part dimensions
  2. 02Sample lotOptional · typically ~20 days
  3. 03Production & testingTypically 25–35 days
  4. 04Documents & dispatchHeat-linked lots and packing

Connection & acceptance

High-pressure seawater & concentrate flanges: Concentrate chemistry · flange pressure · phase-balance acceptance.

Material & final condition

Solution annealing and rapid cooling control phase balance and limit harmful intermetallic phases.

Connection inspection

Stud length · nut pattern · external / internal thread fit. Heat traceability · mechanical properties · specified phase-balance and corrosion tests.

Matching Kit

Flange Stud Bolt Kits

Build your Super Duplex 2507 stud & nut set enquiry

Upload drawing instead
RFQ LINESuper Duplex 2507 Stud & Nut Sets; UNS S32750; Full-thread stud + 2 nuts

Questions about Super Duplex 2507 fully threaded stud & nut sets

What matters beyond choosing 2507 for the set?

Both stud and nut grades, thread fit and mechanical requirements belong on the order. Phase-balance and corrosion-test requirements apply to the specified component condition, with traceability maintained through set packing.

Technical references & photo credits

Catalogue photography shows product form. Application examples connect alloy properties to equipment duties; they are not customer installation records. Quantities, schedules and the inspection scope are confirmed in the quotation.