Mineral-processing conveyors and stockpiles among dry hills and red-earth haul roads

Special alloy fasteners for Mining & Mineral Processing.

Corrosion-resistant cover studs and pump fasteners for acid leaching, dosing and process-water circuits.

EN 10204 3.1 MTCHeat traceabilityMechanical test resultsPMI testing available

Which fasteners fit your mining and mineral-processing applications?

BYBOLT supplies Hastelloy C-276 stud & nut sets for corrosive leach-vessel covers, Alloy 20 hex bolts for sulfuric-acid dosing equipment and Super Duplex 2507 stud bolts for chloride-bearing process water. Inconel 625 double-end studs secure pump covers with separate body and nut threads. Group the replacements by equipment tag for your next shutdown.

Fasteners for leach, slurry & process-water equipment.

Horizontal mineral-processing autoclave with an insulated shell, bolted end closure and top-mounted drives on fixed supports.

HPAL (High-Pressure Acid Leach) autoclaves

Titanium Grade 5 studs offer high strength for external HPAL closure hardware where the equipment design calls for them. Keep acid-wetted components separate: Grade 5 is not a general corrosion upgrade for hot sulfuric slurry.

Titanium Gr.5 autoclave studs
Connection requirements
  • Flange face finish and gasket seating area
  • Stud length, thread engagement and nut seating
  • Tightening sequence and preload verification method
Row of hydrocyclones mounted on a steel support frame with feed pipework, conical bodies and a collection trough.

Slurry pumps & hydrocyclone liners

Duplex 2507 liner bolts anchor wear liners against abrasive ore slurry that erodes weaker fasteners rapidly. Their high strength and corrosion resistance keep liners tight despite vibration, impact loading, and frequent slurry surges.

Duplex 2507 liner bolts
Connection requirements
  • Liner hole alignment and countersink profile
  • Bolt head bearing area and washer selection
  • Torque sequence and retightening inspection arrangement
Rows of electrolytic cells with suspended electrode plates, copper-colored conductors and access walkways in an industrial hall.

SX-EW (Solvent Extraction / Electrowinning) cells

Repeated thermal expansion and contraction work cell joints loose unless fasteners accommodate movement without losing clamp load. Titanium Gr.2 hardware maintains secure, corrosion-resistant connections across acid-mist exposure and stray-current environments.

Titanium Gr.2 cell hardware
Connection requirements
  • Cell wall penetration sealing arrangement
  • Insulating washer and sleeve arrangement for stray current
  • Bolt spacing and clamping uniformity
Jaw crusher under maintenance with exposed wear plates, a large grooved flywheel and tools beside its steel base.

SAG/ball mill & crusher wear-plate mounts

Duplex 2205 suits moderately abrasive, wet mill environments, whereas heavily impacted crusher mounts call for 17-4PH strength. Both fastener grades secure wear plates firmly against shock loading, vibration, and continuous ore impact.

17-4PH wear-plate bolts
Connection requirements
  • Wear-plate hole pattern and bolt clearance
  • Hardened washer and nut locking arrangement
  • Installation torque method and wear inspection access
Drained circular thickener showing a central shaft, radial rake arms and an overhead access bridge.

Acid-leach agitators & thickener rakes

Acidic slurry splashing and continuous agitation corrode exposed agitator and rake hardware, risking loosening and contamination. Hastelloy C-276 bolts withstand that combined chemical and mechanical attack while preserving alignment during sustained operation.

Hastelloy C-276 agitator bolts
Connection requirements
  • Shaft coupling bolt circle and alignment requirement
  • Agitator blade mounting face flatness
  • Thread lubrication selection and coating compatibility
Large fume collection hood connected to a vertical flue with a flanged joint, steel supports and maintenance access ladders.

Smelter off-gas & acid-plant ducting

Alloy 20 flange bolts join off-gas and acid-plant ducting where corrosive vapours condense on joint surfaces. Their resistance to dilute sulfuric condensate keeps flanged connections sealed despite thermal cycling and vibration.

Alloy 20 ducting flange bolts
Connection requirements
  • Duct flange alignment and gasket type
  • Bolt material compatibility with condensate exposure
  • Expansion joint movement allowance and support spacing

Acid, Abrasion, and Thermal Cycling.

Titanium performance in sulfuric leach liquor depends strongly on temperature and oxidizing species. Grade 5 adds strength, not a general corrosion upgrade over Grade 2. For HPAL closures, separate external load-bearing studs from acid-wetted hardware and select wetted alloys from the actual liquor data.

What to specify
  • Sulfuric acid concentration range
  • Operating temperature range
  • Slurry solids content
Agitator motor and gearbox on a bolted mounting flange above an insulated process vessel beside a maintenance platform.

Agitator motor and gearbox on a bolted mounting flange above an insulated process vessel beside a maintenance platform.

Compare mineral-processing fastener alloys.

Mining & Mineral Processing: material grade, primary duty, environment, relative material cost and fastener forms
Material gradeMechanical Duty / FocusEnvironmentRelative
cost
Popular
fastener forms
Hastelloy C-276UNS N10276Mixed-acid resistance
Acid leach liquors with chlorides and mixed contaminants$$$$Stud & nut sets
Alloy 20UNS N08020Sulfuric-acid service
Sulfuric-acid dosing and transfer streams$$Hex bolts
Super Duplex 2507UNS S32750High strength
Chloride-bearing process water and sheltered slurry-pump joints$$Stud bolts
Inconel 625UNS N06625Corrosion resistance
Corrosive process liquors and trapped liquid at pump covers$$$Double-end studs

Budget guide: $ lower · $$ moderate · $$$ higher · $$$$ premium. Relative raw-material bands; dimensions, quantity, processing and inspection determine the finished-fastener quote.

Material & cost references

Cost bands group overlapping published supplier ranges for initial budgeting; they are not live BYBOLT prices. Specify the exact UNS and final condition on the order.

Vessel studs, pump studs & acid-service bolts.

Leach-vessel & pump shutdown kits.

Supply the full cover-hardware list for each vessel or pump, including short replacement studs and mating nuts.

Mining fastener traceability & inspection.

EN 10204 3.1 MTC, heat traceability and mechanical test results with each shipment. Add the tests your equipment specification requires.

Optical projectors for inspecting impact specimen notch profiles
Impact specimen notch inspection

Material identity

Match the ordered grade and material heat to the certificate, part identification and packing list.

Final condition

Link the specified processing condition and mechanical results to the finished batch; keep separate heat-treatment batches identifiable.

Drawing dimensions

Asset tag, revision and spare quantities.

Replacement evidence

Use removed-part findings to define any additional chemistry, hardness or dimensional checks for the replacement.

See the certificate and inspection guide

Before you order mineral-processing fasteners.

Send the drawing and the service details for your connection. We can quote the specified parts, finish and inspection package together.

Get a Quote
Can a higher-alloy bolt solve slurry wear?

Material selection addresses corrosion, while direct solids impact also requires attention to location and head protection. Send the worn part and section drawing so both mechanisms can be addressed.

What process information is useful for leach equipment?

Send acid concentration, temperature, oxidizers, dissolved contaminants and cleaning conditions. Identify whether the bolt contacts liquid, vapour, splash or only external washdown.

Can shutdown spares be packed by line or vessel?

Yes. Put equipment tags, drawing revisions and the full mating-part quantities on the list. We can organize and mark packages for each maintenance assembly.

YOUR COMPLETE BOLTING PACKAGE

Send your drawing
or parts list.

Upload the drawing or BOM with its revision. We quote the material, dimensions, quantities and inspection requirements for your equipment.

Equipment/line tag, leach or slurry chemistry, temperature, solids exposure, damaged-part findings, drawing and quantity…

Bolting list and contact details

Drop your bolting list or drawing here

PDF, XLSX, CSV, DWG, DXF, STEP & images

Up to 10 files · 20 MB each · 100 MB total

Files are sent only when you submit.