Bolted inspection cover on a thermal desalination evaporator, with stud and nut sets around the flange

Inconel 625 Stud Sets for Thermal Desalination Evaporator Covers

Thermal Desalination · Evaporator Covers · Inconel 625 Stud Sets

Short answer:

Inconel 625 (UNS N06625) stud and nut sets suit the covers and inspection openings of thermal desalination evaporators (MSF and MED) because the stud threads under the nuts go through repeated wet and dry cycles in warm brine. Brine reaches them through gasket weeps, washdown and every opening of the cover, then dries and concentrates in the crevice under the nut, with scale building up between openings. With 8–10% molybdenum and at least 58% nickel, the alloy resists crevice corrosion better than 316L or super duplex, and nothing in the evaporator's temperature range embrittles it. It isn't immune: a tight crevice in hot, aerated brine can still attack 625.

Its weak point is strength. ASTM B446 Grade 1 bar has a 414 MPa minimum yield up to 102 mm, so on a cover designed around a stronger stud, the 625 stud may have to go up a size.

Conditions change with the evaporator type. MSF plants keep their hottest stage below about 120°C, MED plants run cooler, and each later stage runs cooler again, so the same cover design sees different service along the train. On vacuum stages, a leak draws air in rather than pushing brine out. Oxygen and wet deposits reach the threads mainly at deaeration and vent sections, and at covers left open during shutdown.

Covers are opened for descaling, often with inhibited acid. A set that has to be cut off before cleaning can start is no use, so the order should state how often each cover opens, the cleaning chemicals and the thread lubricant.

Super duplex 2507 is the higher-strength option for heavily loaded covers on cooler stages in deaerated brine. Avoid 316L for crevice-bearing stud joints in hot or aerated brine.

We pack 625 sets per cover, with a minimum order of 100 pieces, each set traceable to its EN 10204 3.1 certificate.

In this guide

An evaporator inspection cover is bolted shut, opened for inspection and cleaning, and bolted shut again, many times over the plant's life. Ordering its studs as plain "seawater studs" ignores the scale, the wet and dry cycles and the repeated opening.

Diagram of an evaporator cover stud with brine below, vapour and condensate above, wet deposit under the nut, and the ASTM B446 Grade 1 minimums for 625 bar
View full-size diagram
Figure: Evaporator cover: brine below, vapour and condensate above, wet deposit under the nut, with the ASTM B446 Grade 1 minimums for 625.

Stage temperature and what reaches the threads

Calcium sulfate scale is what caps the top brine temperature of an MSF plant; one recent study of calcium sulfate scaling puts current plants below 120°C. MED plants generally run lower top temperatures than MSF, and in both designs every later stage or effect is cooler than the one before.

Most cover studs sit outside the pressure boundary, so the question is how brine gets to them, not whether they are immersed. For each cover, state:

  • the evaporator type and the stage or effect, with its temperature and pressure (many stages run below atmospheric)
  • whether the studs are internal or external to the shell
  • how brine reaches the threads: gasket weeps, external condensation, washdown, or splash during opening
  • whether the section is deaerated, or open to air at vents and during shutdown

The damage on these joints usually comes from brine salts left in the crevice under the nut, which concentrate each time the joint dries out, and from oxygen where the section is not deaerated.

Scale, cleaning and the opening cycle

Calcium carbonate, magnesium hydroxide and calcium sulfate scale forms on brine-wetted hot surfaces, which includes any internal studs. Under external nuts the deposit is dried brine salt from leaks and washdown. Either one under a nut makes a new crevice and locks the thread, so the nut that came off easily at commissioning is the one that seizes after a year.

State how often each cover is opened, whether the studs are removed or cleaned in place, and which cleaning chemicals reach them. Descaling usually uses inhibited hydrochloric or sulfamic acid. 625 resists dilute cleaning acids at ambient temperature better than stainless studs, but its resistance to hydrochloric acid falls as concentration and temperature rise, so send the acid, its strength and its temperature with the enquiry.

625 nuts on 625 studs can seize by galling if assembled dry. A thread lubricant suitable for brine service, named on the order and used at every reassembly, reduces the risk of seizure through the cleaning cycle.

625 against 2507 and 316L

Inconel 625 gets its corrosion resistance from chromium and molybdenum: the Special Metals 625 bulletin gives at least 58% nickel, 20–23% chromium and 8–10% molybdenum. Strength is the trade-off. ASTM B446 Grade 1 bar has minimums of 827 MPa tensile and 414 MPa yield up to 102 mm, falling to 758 MPa and 345 MPa above. Size the stud from that yield, and check on the cover drawing that a larger stud fits the bolt circle and the nut clearance.

Candidate UNS and specification Where it fits an evaporator cover What to watch
Inconel 625 N06625, ASTM B446 Grade 1 Hot stages, aerated sections, frequent opening and cleaning Lower strength; may need a larger stud
Super duplex 2507 S32750, ASTM A479 bar / A1082 Cooler stages in deaerated brine with high cover load Crevice margin shrinks in hot, aerated brine
316L S31603 Lightly loaded, dry or rarely wetted covers Crevice attack and cracking in hot or aerated brine

Related references: Super duplex 2507

Alleima lists a 550 MPa minimum proof strength for SAF 2507 bar, which is why it suits heavily loaded covers. In deaerated brine at the cooler stages it holds up well. On hot first stages, at aerated vents, or where brine dries and concentrates under the nuts, 625 has more headroom, the same trade-off we cover for seawater flanges.

Ordering the set

Order studs and nuts together as a set per cover, from one heat for the studs and one for the nuts, with the spare set ordered alongside. Evaporator covers often use thick gaskets, so give the stud length with the actual gasket rather than the standard one. Mark each set with its cover and stage.

When covers come off, compare removed studs stage by stage before reordering, and note whether the attack sits under the nuts or on the exposed thread.

Confirm before ordering Why it matters Document to ask for
Evaporator type, stage, temperature and pressure Hot first stages and cool last stages can need different grades Evaporator datasheet
Internal or external studs, and how brine reaches them External studs see leaks and wet/dry cycles, not immersion Cover drawing
Deaerated or aerated section Oxygen controls crevice risk Process description by section
Cover and flange material 625 studs in a carbon steel or copper-nickel cover can drive galvanic attack at the bolt holes Cover drawing, isolation details
Scale, opening frequency and cleaning acid Deposits lock nuts; acid strength and temperature decide whether 625 is enough Maintenance procedure
Stud size against bolt circle 625 may need a larger stud Cover drawing
Heat and set marking Ties each set to its cover Set list with EN 10204 3.1 certificates

Related references: EN 10204 3.1 certificates

Requesting a quote

Most of what the engineering team needs fits in one line: "M20 Inconel 625 stud and nut sets for MSF evaporator inspection covers, stages 1–6, 90–108°C, external studs, deaerated brine, inhibited HCl descaling twice a year, 3 mm gasket, 24 studs per cover, plus one spare set per stage."

With that, we can review the specified grade, dimensions and inspection requirements for each stage and quote 625 stud and nut sets packed per cover. Stud sizing against the cover load stays with the equipment designer; send the design inputs if you want them checked. Bolting for the reverse osmosis side of the same plant is covered under water treatment and desalination.