Typical MOQ
10pieces
Subject to product and material review.
Conditions
MOQ is typically 10 pieces, subject to product, material and manufacturing-route review.
Set final aged strength and hardness, treatment traceability and any sour-service acceptance criteria. A material standard does not establish sour-service compliance.
N09925 is explicitly identified in B805 and the reviewed B637 grade table. Do not label B805 as a forging specification.
N09925 · bar and wire
B805 is a bar/wire route. B637 is a separate possible bar/forging-stock route; specify which applies and the final solution / aging condition.
Select the bolt or cap-screw pattern, head dimensions and thread length. Hex and heavy hex are different choices.
State diameter, TPI, series and external class: e.g. 1/2-13 UNC-2A or 1/2-20 UNF-2A. Select 2A / 3A with the mating-thread fit; UNC and UNF do not mate.
Mechanical test methods for fasteners; select applicable tensile, yield and hardness tests. This standard supplies methods, not a material grade or pass/fail limits. Define those limits and sampling in the part specification.
Test-method reference ↗Historical samples support the stated grade coverage. The ordered edition controls the full requirements.
Example dimensions, not a stock size.
Simplified right-hand thread appearance. No tolerance, fit or standard compliance is simulated.
Head proportions are illustrative: s = 1.5d, k = 0.625d. They are not standard-table values and will not be submitted as specified dimensions.
Every delivery traceable by heat number
Included with every delivery
GO / NO-GO gauging · sampled inspection
Methods, sampling and acceptance criteria follow the agreed specification. PMI, third-party inspection and additional records are agreed separately.
During quotation, a redacted certificate from a previous order can show the document format and recorded tests. It is a historical example, not certification of this product or a new order. Shipment documents must correspond to the material and batch actually supplied.
How to read a historical certificate sample ↗Send a drawing and quantity.
No drawing? Use these details.
N09925, final treatment and required strength / hardness acceptance.
Identifies the condition to be evaluated for the joint.
Applicable standard and edition, environment and project restrictions.
Avoids inferring sour-service compliance from the alloy name.
B805 bar / wire or the applicable B637 stock route, edition and final-lot test records.
Keeps catalogue references separate from agreed finished-bolt compliance.
Indicative terms; confirmed in your quotation.
10pieces
Subject to product and material review.
MOQ is typically 10 pieces, subject to product, material and manufacturing-route review.
~20days
Freight, import duties and taxes are separate.
Samples are typically reviewed on an approximately 20-day basis. BYBOLT may cover agreed sample manufacturing; buyer freight, import duties and taxes remain separate.
25–35days
Urgent requirements can be discussed.
Regular production is commonly reviewed on a 25–35 day basis. Urgent requirements can be discussed against the complete specification.
30%
T/T or LianLian. Balance before dispatch.
Payment can be arranged by T/T or LianLian. A typical order uses a 30% deposit, with the balance completed before dispatch.
B805 identifies N09925 bar and wire. B637 is another material route to check for the specified bar or forging form. Name the applicable form, edition and final solution/aging condition; B805 should not be described as a forging specification.
A material certificate establishes only its stated scope. For sour service, include the governing specification, environmental limits, final hardness and required test evidence. Link those requirements to the finished bolt condition and lot.
M12 × 1.75–6g12 mm diameter · 1.75 mm pitch · external class 6g
1/2-13 UNC-2A1/2 inch · 13 TPI · coarse · external class 2A
1/2-20 UNF-2A1/2 inch · 20 TPI · fine · external class 2A
Examples explain designations, not available sizes. Specify fine pitch explicitly. UNC and UNF do not mate; full or partial threading is a separate choice.
Thread classes and inspection ↗Download the PO and receiving checklist (PDF)
Send a drawing or add your dimensions and quantity.